-
Snip purple wires to sending unit and mark where each wire goes.
Pop out metal float arm CAREFULLY.
Take sending unit off fuel pump bucket.
Sniff fingers cause they smell like gas...and laugh to yourself.
Lay backside of sending unit down on hard, metal surface.
Find a punch or 1/2" rachet extension that is as wide as the metal swivel the metal float arm snaps into.
Hit center of metal swivel with short, sharp hits with hammer until swivel tightens up a little.
Pop metal float arm back on and check swivel to make sure it moves back and forth freely.
Smell fingers again--because you love the smell of unleaded.
Once the fingers of the swivel have solid contact with sending unit and it swivels freely (but tighter than before), you are ready for reassembly.
Carefully pop metal float arm back off.
Strip wires back slightly and solder together.
Snap sending unit back in and pop metal float arm back on.
Aaaaaaaaaaand done.
2000 ECSB 6.0L
TORQUER V2 CAM ● COMP 918's ● 7.4 HARDENED PUSHRODS ● K&N SERIES 77 CAI ● 80mm BBK ●PACESETTER LT HEADERS AND 3'' ORY ● SUPER 40 FLOW ● 3000 STALL ● 4.10s ● BUILT 80e ● VORTEC PERFORMANCE TUNE ● MSD 8.5mm PLUG WIRES● ELEC. CUTOUT ● UD & ALT PULLEYS ● FLEX-A-LITE E-FANS ● 22" CENTERLINE STINGRAY III's ● LUND FIBERGLASS TONNEAU ● 2" LEVELING SHACKLES ● 12K HID LOWS & FOGS ● LEDs ● DEBADGED ● WHITE-FACED ESCALADE GAUGES ● KICKER 450.1 ● 2-CVR 10's ● DS60's ● K693's
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
Forum Rules